No. |
NAME OF WORK |
FIRM |
AMOUNT |
| |
Construction of NAHI Vadodara - Bharuch Section
from 150 to 170
KM |
L&T |
1100.00
Lacs |
| |
- Construction of Electrical Shop and Office Building
- Construction of Adm Building and Power Service Work Shop for Power Service Division
- Construction of Check and Change Room and QMC Building
- Construction of Innocenti lath Machine Foundation
- Construction Of Adm. Building
- Construction storm water drain and Road.
- Construction of Skoda Machine Foundation, Stress reliving Furness & other Heavy equipment foundation
- Civil and Structural work for Construction of Compound Wall.
- Civil Work for expansion of Bay-1 & Bay -2 in Maneja Unit Baroda
- Civil & Structural Work for Construction of PELTON LAB.
- Civil & Structural Work for Bay-1
- Extension and office Building for PSWS
|
Alstom Project India Limited Vadodara |
1486.59 Lacs |
| |
Civil works for Cable trench, Man Hole and Main Pipe rack Const. of R.C.C. Paving & Miscellaneous Civil works, Road Work Temp Site office etc. |
Samsung Eng. Co. Ltd. Korea IOCL Lab Project Baroda. |
800.00
Lacs |
| |
Civil Works for IOCL Job 4312 Including White oil Sub-Station Pump-house, CGP sub-Station, Pipe Rack and Comp. Wall. |
SPS(Bombay) IOCL,
Gujarat Refinery Baroda |
315.52
Lacs |
| |
Civil and Structural work for construction of Service Center, GIDC Savli |
Mahindra Intratrade Ltd. Mr. M. Mohan -chandran |
260.00
Lacs |
| |
Building construction sub Station building site office and Warehouse at DHDS & Utilities offsite Project at Gujarat refinery Baroda. |
Daelim Engg. Co. Ltd. (Korea) G.R. Baroda. |
211.81
Lacs |
| |
Civil Works for BWSSB Project Bangalore. Pipe-Way Bridge, Cause-Way, Saddle support, Encasing etc. |
Dodsal Limited
BWSSB
Bangalore. |
200.00
Lacs |
| |
Civil work for const. of in Utilities off sites area of G.R. Baroda |
Daelim
Engg. Co (Korea) G.R. Baroda. |
190.12
Lacs |
| |
Civil & Structural Work of Tankage and Associated Works for Utilities & Off sits of PxPTA Project of M/s. IOCL Panipat |
I.O.T.L.Panipat Refinery, I.O.C.L. PANIPAT |
183.00
Lacs |
| |
Civil work for const. Of raw Water Pump house.
Manhole Chambers, Road Crossing, /Pipe encasing |
Dodsal Ltd. (Ahmedabad Municipal Corporation.) |
165.04
Lacs |
| |
Construction of Tank Pad and all related Civil Works Inside the Tank Farm Pertaining to Tank No.48-TT-FR-001 E/F ( Naphtha Storage Tank - 45.4m dia X 13.4m Ht. External Floating Roof Tank) |
I.O.T.L., Panipat Refinery, I.O.C.L. PANIPAT |
142.00
Lacs |
| |
Civil Woks for rail Loading Gentry. |
S.P.S
(Bombay) IOCL Baroda. |
125.00
Lacs |
| |
Construction Tank Pad Foundation R.C.C. Dyke wall and other connected
Civil works of 4nos. 56 storage tanks for A.U.V. Project at Gujarat Refinerry, Baroda. |
Shrinivas Plates & Structures Co. Ltd. (ICTL Baroda) |
124.97
Lacs |
| |
Civil Works for IOTL Dumad Project (Baroda) |
SPS(Bombay) IOTL Baroda |
110.00
Lacs |
| |
Civil Works for 2 Nos.Moulded bullets at IOCL G.R.Baroda |
G.R.Engg, Co. Mumbai |
105.00
Lacs |
| |
Civil Works for New Flair stack at IOCL, G.R.Baroda. |
Bridge & Roof Co. (I) Ltd. IOCL, G.R. Baroda. |
105.00
Lacs |
| |
Civil Dismantling / Earth Work for reside up gradation project at Gujarat Refinery-Package -08 |
Indian Oil Corporation Ltd. Gujarat Refinery Baroda |
123.20
Lacs |